Duron was asked by Campbell Kennedey to step in when their original civil trades sub contractor backed out of their commitment.
Duron provided block walls, overhead garage doors, concrete repairs, fire rated enclosures and openings through 3 floors of the hotel and structural steel to support an exhaust stack.