The location seen in the attached image used to be several parking spots under Place de Ville. Behind those doors Duron built a new vault that was required to provide power to Ottawa’s new LRT. The project entailed, fire alarm, electrical, ventilation and a 2 hour fire separation on all sides of the vault including the ceiling. The ceiling required a special anchoring system for the electrical equipment along with a steel deck installed on the ceiling.